Future Las Vegas – Loop by the Boring Company

FUTURE LAS VEGAS - BORING COMPANY LOOP

VIDEO COMING SOON


LAS VEGAS CONVENTION CENTER (LVCC) LOOP

The LVCC Loop system — a three-station transportation system consisting of 1.7 miles of tunnel — was built in approximately one year, using the now-legacy Godot Tunnel Boring Machine. LVCC Loop’s cost was approximately $47 million (firm fixed pricing) for the two tunnels and three stations (two surface and one subsurface). Tunneling occurred during large conventions (>100,000 attendees pre-COVID) with zero road closures and zero disturbances.

LVCC Loop connects the LVCC West Hall with the existing campus (North/Central/South Halls), and reduces a 45-minute cross-campus journey time to approximately two minutes.

LVCC Loop opened in April 2021 for the Mecum Motorcycle Auction and has operated at all subsequent conventions. At SEMA 2021, LVCC Loop transported between 24,000 and 26,000 passengers per day. At CES 2022, LVCC Loop transported between 14,000 and 17,000 passengers per day, with an average ride time of less than two minutes and average wait time of less than 15 seconds.

VEGAS LOOP

Vegas Loop will include LVCC Loop and any future service extensions including those to casinos along the Strip, Harry Reid International Airport, Allegiant Stadium, downtown Las Vegas, and eventually to Los Angeles. Vegas Loop will provide fast and convenient transportation to the Las Vegas community, its visitors, and beyond.

On October 20, 2021, the Clark County Commissioners unanimously approved Vegas Loop, a 29-mile tunnel network connecting 51 stations throughout the resort corridor and beyond, as shown on the map to the right:

 

Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Designers

The Boring Company

Colaborators

Local Government

Las Vegas City Goverment

Scale

140,000 sq

Date

2019-2028

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Calgary – New Central Library by Snohetta

FUTURE CALGARY - NEW LIBRARY

VIDEO COMING SOON


Calgary’s new Central Library has opened its doors to the public. The building, designed in collaboration with DIALOG, aims to welcome over twice as many annual visitors to its expanded facilities, filling a vital role for the rapidly expanding city. Calgary Public Library is one of the most actively used library systems in North America, where more than half of its residents are active cardholders, and accordingly, the new main branch was created for and inspired by its diverse inhabitants.

The building is sited within a complex urban condition, where a fully functional Light Rail Transit Line crosses the site from above to below ground on a curved half-moon path, dividing Downtown and East Village. In response, the design lifts the main entry over the encapsulated train line. Gently terraced slopes rise up to the heart of the building, allowing for people arriving from every direction to interact with the library. Doubling as a portal and a bridge, the entry plaza heals the previously-split seam between the two neighborhoods and re-establishes visual and pedestrian connections across the site.

 

Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Designers

Snohetta

Colaborators

Local Government

Calgary City Goverment

Scale

140,000 sq

Date

2019-2020

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Stockholm – Jä​​rva Stadspark Park

FUTURE STOCKHOLM - JARVA STADPARK

VIDEO COMING SOON



Järva Stadspark is a proposal to transform the green area of Järvafältet in northern Stockholm into a park whit a new city district that allows the park to continue up on top of the new district’s roofs.

Järvafältet is a green area in northwest Stockholm that unites several of the city’s suburbs. It is also one of Stockholm’s green wedges, yet the area is relatively unused and difficult to access. The proposal aims to transform Järvafältet into a central park in northern Stockholm by making it more accessible and providing it with recreation and leisure activities. The proposal also connects the surrounding suburbs Rinkeby and Kista whit a new city district in the eastern part of the area. A district growing from allotment gardens to skyscrapers with connected roof terraces making the city district into a climbable hill. The project was commissioned by the Stockholm Center party.

The Park

The green area today consists of agricultural land that is inaccessible in many places. The area has few natural connections between the suburbs north and south of the area and is difficult to move around in. The proposal aims to make Järvafältet into a city park and make the area accessible to it surrounding districts. The proposal suggests clear pedestrian and bicycle paths between the suburbs north and south of the park and a low-speed road for pedestrians, cyclists, and cars around the park. The local hill Granholmstoppen will be built higher and be equipped with a ski and mountain bike slope on its northern slope. The local stream Igelbäcken will be broaden where it is technically possible and ecologically suitable and provide water for a new lake for swimming and ice skating. The park will contain several sports fields and exercise trails for running, cycling, horseback riding and skiing in the winter. The park will also contain barbecue areas, small public huts as well as an amphitheater with space for large outdoor events such as theater and concerts.

The city

The new city district will contain small to tall buildings in wood with approx. 12,000 new apartments and 140,000 square meters of office and business space connecting the suburbs Rinkeby in the south whit Kista in the north. The local street Rinkebystråket is extended to Kista and becomes the new district’s main street. A new tram line crosses the district from Kista to Rinkeby with terminus in Vällingby. The new district will be a mix of the architecture of the existing buildings around Järvafältet today ranging from small allotments and city townhouses close to the park to skyscrapers in the city center. A green wedge is retained along Igelbäcken and becomes a park through the new district. The new city park is extended up on the roofs terraces via footbridges and will be Stockholm’s highest park promenade with a view of northern Stockholm.

Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

Anders Berensson Architects

Colaborators

Local Government

Stockholm City Goverment

Scale

140,000 sq

Date

2019-2028

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future New York – Brooklyn Park

FUTURE NEW YORK - BQH PARK

VIDEO COMING SOON


Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

Bjarke Ingels

Colaborators

Local Government

New York City Goverment

Scale

100,000 sq m

Date

2019-2028

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Amsterdam – The Valley in Zuidas

FUTURE AMSTERDAM - THE VALLEY ZUIDAS

VIDEO COMING SOON


Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

MVRDV

Colaborators

Edge

Local Government

Amsterdam City Goverment

Scale

100,000 sq m

Date

2019-2023

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Berlin – EDGE EAST TOWER

FUTURE BERLIN - EDGE EAST TOWER

VIDEO COMING SOON


Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

Bjarke Ingels Group

Colaborators

Edge

Local Government

Berlin City Goverment

Scale

80,500 sq m

Date

2019-2023

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Shanghai – International Financial Center

FUTURE SHANGHAI - INTERNATIONAL FINANCIAL CENTER

VIDEO COMING SOON


EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

Paper Planes

Colaborators

Local Government

Berlin Citi Goverment

Scale

500,000 m2

Date

2012-2028

OTHER PROJECTS

Future Berlin – Radbahn Kreuzberg

FUTURE BERLIN - RADBAHN KREUZBERG

VIDEO COMING SOON


In 2019, the Radbahn vision turned into a feasible pilot project: Reallabor Radbahn. The purpose of the project is to critically review and further develop the original Radbahn concept and to establish a basis for decision-making regarding the construction of the entire Radbahn route.

Together with the Berlin Senate Department for Urban Development and Housing, paper planes applied for funding through the federal program National Projects of Urban Development. The program supports conceptual and physical projects that demonstrate particularly high urban development quality, promote participation processes and show great innovation potential. The application was successful, as a result of which the federal government and the state of Berlin are funding the Reallabor Radbahn until the end of 2023.

Timeline

2012

Studies and Conceptual Project

2022

Public Consultation

2028

Project Completed

Facts

Architects

Paper Planes

Colaborators

Local Government

Berlin City Goverment

Scale

500,000 m2

Date

2012-2028

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

OTHER PROJECTS

Future Mexico City – AIFA Airport

FUTURE MEXICO CITY - AIFA AIRPORT

The zuidas area of amsterdam is an important international business center lacking residential quarters. MVRDV’s ‘valley’ will transform the area into a more livable and complete urban quarter, ‘welcoming large amounts of residents and additional public facilities to the area over the next decade’. the project is defined by three peaks of varied heights which reach up to 100 meters, where a publicly accessible sky-bar offers panoramic views over amsterdam. the complex consists of 196 apartments, 7 stories of offices, a three-story parking lot, and various retail and cultural facilities.

WHATCH THE VIDEO HERE

EXPERIENCE THE PROJECT IN OUR VR TOUR POWERED BY TWINMOTION

Timeline

2020

Studies and Conceptual Project

2022

Public Consultation

Facts

Architects

FGP

Colaborators

Local Government

Mexican Federal Goverment

Scale

500,000

Date

2020-2022

Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide 2 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Previous
Next
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.